Rotate to portrait mode to view the website

The KG desktop site is undergoing maintenance. Please visit the mobile site in the meantime

BALLARAT

STATUS
CONSTRUCTION

LOCATION
BALLARAT

TEAM
KG

BUILDING CLASS
Class 2 Type B

SERVICE
DESIGN & CONSTRUCTION

Design and construction of 7, NDIS provisioned apartments for Adaptive Housing.

Featuring a proprietary, preclad modular timber framed system with 7.5 star efficiency. Details include polished concrete floors, weathertex selflok and eco-groove, capral 325 low-e DGU’s, self sufficient tesla solar array, hydronic heating, impact gypsum and polytec surfaces.

PHASES

View All / Hide All
Complete 03.06.2021

Morning Light. A new standard in SDA for Victoria.

Complete 03.06.2021

Bathrooms.

Complete 03.06.2021

Fab prefab. Exterior close up.

Construction 01.06.2021

Embrace your individuality. Fit out.

Construction 24.03.2021

Raked ceiling. Wide hallway for wheelchair access. Electrical fit off.

Construction 24.03.2021

Wide doorways for wheelchair access. Electrical fit off.

Pre Construction 27.11.2019

Modular shop drawings. Image credits: KPA Engineering and KG.